Information | ||
Derechos | Equipo Nizkor
|
14Aug23
Invictus set to start drilling at Mukuyu-2 well in Zimbabwe
Upstream oil and gas company Invictus Energy is set to start drill test work at the Mukuyu-2 well site at the Cabora Bassa Project in Zimbabwe, as it begins the mobilisation of Exalo Rig 202.
Located 6.8km to the north-east of the Mukuyu-1 well, the Mukuyu-2 well is to be drilled to a total depth of approximately 3,700m to access seismic reflectors interpreted to be the Lower Angwa sequence.
To be spudded in September 2023, the well's primary target interval is the Triassic Upper Angwa Formation. The target sits 400m shallower at Mukuyu-2 than at Mukuyu-1.
In a press statement, Invictus said: "This location will provide excellent information on the distribution and reservoir quality of Upper Angwa sands."
Invictus Energy managing director Scott Macmillan said: "The commencement of the rig mobilisation marks another milestone in the project as we prepare to commence drilling the Mukuyu-2 appraisal well as a follow-up from our highly successful basin opening Mukuyu-1/ST-1 well to confirm a discovery."
[Source: Offshore-technology.com, New York, 14Aug23]
This document has been published on 18Mar24 by the Equipo Nizkor and Derechos Human Rights. In accordance with Title 17 U.S.C. Section 107, this material is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. |